翰昌抛丸机的安装技巧
Hachieve| Time2011/12/14 8:40:42
Share:


所有抛丸机在安装过程中都要遵守如下守则:
1、主机就位:主机在就位时其水平度、重量度必须达到图纸要求。
2、分部件安装应由下至上进行。
3、道轨式或悬链式、辊道式都应由设备内致外围。
4、在试车时应先部分预试,正常后再全部运转。


  • Other:
  • Qingdao Hachieve Mechinery Equipment Co., Ltd comprehensively implements equipment installation and finishing work before the Spring Festival, 2020 to fully guarantee the scheduled production of major cooperative steel plants throughout the country(2020/1/19 14:47:26)
  • What spare parts does the shot blasting machine need?(2013/11/28 8:09:24)
  • The correct operation for our shot blasting machine(2013/11/16 9:35:49)
  • Shot blasting machine cleaning principle(2013/11/12 14:05:42)
  • When use a drum type shot blasting machine is more efficient(2013/4/29 10:22:06)
  • Normal operating rules of shot blasting machine(2013/4/29 10:21:07)
  • Copyright (c) 2011-2012 www.hanchangjixie.com all rights reserved   Qingdao Hachieve Machinery Equipment Co. ,Ltd.
    Add:LinGang Road, LinGang Industry Park, Huangdao, Qingdao,Shandong,China | Service:+86-532-86110910/86165838
    E-MAIL:hachieve@163.com| Http://www.hanchangjixie.com 鲁ICP备07020562号-1