Steel line shot blasting, painting and drying production line
Click:
14386
Counsulting:
VIP Free Hotline: 400-008-0910
Equipment counsulting hotline:
0532-86110910
Order:
Share:
Introduction
1) Roller Conveyor QXY Steel Pretreatment Line
refers to the processing process in which the steel is shot blasted to remove rust and coated with aprotective primer before processing (that is, the state of the raw material).
1)Workpiece conveying system
2)Shot blasting
3)Pill cleaning
4)Pill recycling purification
5)Dust removal system
6)Spray booth
7)Drying room
8)Paint mist filter device and harmful gas purification device
9)Electrical control system
QXY Technical Peremeters
No
Name
Unit
Type1
Type 2
Type 3
1
width of the workpiece
mm
Under 2500
under3500
Under 4500
2
Model
QXY2000/2200/2500
QXY3000/3200/3500
QXY3500/4000/4500
3
Plate width (Max)
mm
number after QXY
number after QXY
number after QXY
4
Plate thickness
3~60
3~60
3~100
5
smallest section of profile
mm*mm
60*80
60*80
------
6
largest section of profile
mm*mm
1000*300
1000*300
------
7
shortest workpiece
mm
2400
2400
2400
8
Maximum workpiece
mm
12000
12000
12000
9
Conveyor speed
m/s
1~5(Note)
0.5~4(Note)
4~6(single)
10
Derusting Quality Level
ISO8501-1,1988
GB8923-88
(Bsa2.5)
11
Surface roughness
μm
40~70
40~70
40~70
12
Paint Film thickness
μm
15~25
15~25
15~25
13
Paint type
Quick-drying-type zinc-rich primer
Quick-drying-type zinc-rich primer
Quick-drying-type zinc-rich primer
14
Installed Power
kw
Accordingly
Accordingly
Accordingly
15
air consumption
m3/min
5~7
5~7
5~7
16
air pressure range
MPa
0.4~0.6
0.4~0.6
0.4~0.6
17
first addition of pills
T
8~10
8~10
12~16
Copyright (c) 2011-2012 www.hanchangjixie.com all rights reserved Qingdao Hachieve Machinery Equipment Co. ,Ltd.
Add:LinGang Road, LinGang Industry Park, Huangdao, Qingdao,Shandong,China
| Service:+86-532-86110910/86165838
E-MAIL:hachieve@163.com| Http://www.hanchangjixie.com 鲁ICP备07020562号-1